Standard Installation & Safety Guarantee: 6 Core Notes for Shelf Installation

The stability, safety and long service life of shelves rely on standardized installation procedures and strict detail control. To ensure project quality and avoid potential safety hazards, we have sorted out the core notes for shelf installation combining industry specifications and practical experience, providing professional guidance for project construction.

1. Compliant and Qualified Measuring & Testing Equipment

All measuring and testing instruments, meters and relevant equipment used in the installation must comply with the provisions of China’s current metrological verification laws and regulations, and their accuracy grade shall be not lower than the accuracy requirement of installation, so as to ensure the accuracy and reliability of testing data and lay a solid foundation for installation quality.

2. Concealed Works Inspected Before Concealment

Special inspections must be completed for concealed works (such as foundation reinforcement, embedded part fixation, etc.) prior to shelf installation before their concealment. Subsequent construction can only be carried out after passing the inspection and confirming the records, eliminating potential quality hazards in concealed parts.

3. Abide by Standards to Ensure Safety and Benefits

For the general installation and acceptance of shelves, we strictly follow the principles of “quality first, safety paramount, technological innovation and benefit improvement”. All construction procedures are based on relevant standards to ensure up-to-standard project quality, drive technological progress of the industry and achieve the dual improvement of economic benefits and safety guarantee.

4. Construct in Accordance with Drawings; Modifications Subject to Approval

Installation and construction must be strictly carried out in accordance with design drawings, and arbitrary revision of construction plans is prohibited. If inconsistencies between on-site actual conditions and design plans are found during construction, construction shall be suspended immediately and feedback given in a timely manner. Construction can only be resumed in accordance with the new plan after the approval of the design modification application.

5. Compliance with National and Industrial Standards

In addition to strictly implementing the enterprise’s relevant standards, shelf installation and construction shall fully comply with the provisions of current mandatory national and industrial standards and specifications, ensuring the compliance and professionalism of the entire construction process.

6. Strengthen Self-inspection and Control During Construction

A regular self-inspection mechanism shall be established throughout the installation process. Construction personnel shall conduct real-time inspections on all key processes (such as fastener tightening, horizontal and vertical alignment calibration, etc.), identify and rectify installation deviations in a timely manner, and ensure that each construction process meets the quality requirements.